Skip to main content
Globe Lines
Filter
IPF BELARE team making adjustments to main door of PEA's new garage
jpeg - 9.66 MB
Princess Elisabeth Antarctica Research Station
2020
IPF BELARE team making adjustments to main door of PEA's new garage
In bad weather conditions, snow can infiltrate the station, even through the tiniest gap. In order to avoid this, the team made adjustments on the main door of the garage, making it possible to use even during snow storms.
Johan Demuylder installs solar panels on the Pricness Elisabeth Antarctica's new garage
jpeg - 10.34 MB
Zero Emission Target Philosophy
2020
Johan installing cables for new solar panels on garage
Johan installs cable trays and electric cables that will be connected to the new solar panels on PEA's new garage, December 2020.
North annex PEA stainless steel panels
jpeg - 6.87 MB
Princess Elisabeth Antarctica Research Station
2020
Stainless steel panels put on north annex of PEA
Stainless steel panels are placed on the north annex of the Princess Elisabeth Antarctica station, December 2020. The entire station is covered in stainless steel panels for protection.
engineer Guus Luppens cables inverters to solar panels at PEA
jpeg - 8.35 MB
Zero Emission Target Philosophy
2020
Guus Luppens cables inverters to solar panels
Engineer Guus Luppens connects the electric cables from the solar panels freshlin installed on the outside walls of hte new garage to the inverters, which convert the direct current the solar panels produce into an alternate curre...
New solar panels on PEA's new garage
jpeg - 7.54 MB
Princess Elisabeth Antarctica Research Station
2020
Guus Luppens and Johan Demuylder install new solar panels on PEA's new garage
In December 2020, Guus Luppens and Johan Demuylder install solar panels on the front side of the new garage at PEA, which had been completed in Feburary 2020.
Guus and Johan wiring new solar panels on PEA gagarge
jpeg - 8.04 MB
Zero Emission Target Philosophy
2020
Guus and Johan wiring new solar panels on PEA's new garage
The new set of solar panels placed on PEA's new garage in December 2020 is ready to be wired to the station's micro grid, which manages the distribution and use of the electricity produced.
Eastern side of new garage
jpeg - 7.19 MB
Zero Emission Target Philosophy
2020
Eastern side of new garage at PEA
The eastern side of the new garage is now protected by a layer of stainless steel plates and equipped with extra solar panels, which produce about 10% more renewable energy for the station. This will help fill energy production ga...
IPF President and Founder Alain Hubert doing maintenance on treated water crevasse form the water treatment unit
jpeg - 6.78 MB
Zero Emission Target Philosophy
2020
Alain Hubert doing maintenance on treated water crevasse
Under the station, Expedition Leader Alain Hubert is doing heavy maintenance in the crevasse where the clean, treated water from the station's water treatment unit is discharged. He uses a drill to direct the flow of discharged wa...
IPF Founder and president and BELARE leader Alain Hubert removing ice from treated water crevasse
jpeg - 6.98 MB
Zero Emission Target Philosophy
2020
Alain Hubert removing ice from treated water crevasse
A large amount of ice blocking the crevasse had to be removed from its depths. Ropes and buckets made removal of the ice blocks possible.